top of page

COMMERCIAL CONSTRUCTION

Smart Warehouses

Period 2012-2014
Location: South America

Design solutions, Installation, and interconnection of telecommunication networks and CCTV system, and construction of automated warehouses that allow, storing, conserving and distribution of medicines, and medical-surgical material, osteosynthesis material for traumatology, medical equipment, and refrigerated supplies.

Aqueduct

Period 2016-2018
Location: Panama

Implementation of extensive feasibility studies, design solutions and construction of an aqueduct track to provide drinking water for over 1500 citizens in the region of Las Guabas.

The recovery and improvement of efficient operation and maintanence system were also implemented throughout the project.

Sanitary Units

Period 2016-2018
Location: Panama

Supply and Construction of 5000 Sanitary Units in the jurisdiction of Chilibre, Pedregal, Santiago, and El Roble

HVAC

Period 2018-2019
Location: Panama

Supply and Installation of the Air Conditioning System for the Disability Comprehensive Center (CAID)

bottom of page